How We Cut a Major Telco's Cloud Bill by 43% in 90 Days
Challenge Runaway AWS costs with no tagging strategy, over-provisioned EC2 instances, and zero reserved capacity planning.
Outcome 43% cost reduction, 99.99% uptime maintained, full FinOps governance framework in place.
43% Cost reduction
90 Days to deliver
99.99% Uptime maintained
Zero-Downtime Payment Stack Migration for a High-Growth Fintech
Challenge A monolithic payments system that couldn't scale past 500 TPS and had no deployment pipeline — manual FTP releases to production.
Outcome Microservices on Kubernetes, GitHub Actions CI/CD, 2,000+ TPS peak, zero downtime during migration.
4× Throughput increase
0 Downtime minutes
15min Deploy time (was 4h)
Headless Commerce Migration — From Magento to Next.js + Shopify
Challenge Slow Magento storefront (8s load time), no mobile experience, and a checkout that lost 60% of users at payment.
Outcome 0.8s load time, 34% checkout conversion improvement, headless architecture ready for global expansion.
0.8s Page load (was 8s)
34% Conversion increase
10× Faster deploys
SOC 2 Type II Certification in 4 Months — From Zero Controls
Challenge Growing enterprise clients requiring SOC 2, but no formal security programme, no policies, and no audit trail.
Outcome SOC 2 Type II achieved, zero critical findings, security as a sales enabler within 4 months.
4mo To SOC 2 Type II
0 Critical findings
3× Enterprise deals unlocked
Real-Time Fleet Tracking Platform — Built in 10 Weeks
Challenge Manual fleet management via spreadsheets, no visibility on driver location, and customer ETA accuracy under 40%.
Outcome Real-time tracking, 94% ETA accuracy, driver mobile app, operations dashboard, API for client integration.
94% ETA accuracy (was 40%)
10wk Build time
300+ Vehicles tracked